Routine Maintenance Work

ROUTINE MAINTENANC WORK will carry out task such as slope inspection and monitoring slope condition. Slope Inspection will be carry out more than once or 3 times every years (depends on slope risk level), It should preferably be carried out more between October and November (monsoon season). It is a good practise to inspect the drainage channels and clear any blockage after a heavy rainstorm.

Slope Inspection
  • To review previous Stability Assessment report

  • To identify all visible changes and sign of slope distress

  • To recommend the necessary preventive maintenance works.

  • To prepare or update the Maintenance Manual to include all relevant information extracted from the previous Stability Assessment

Drainage Cleaning & Grass Cutting
  • Clearance of accumulates debris from drainage channels and slope surface.

  • Repair of cracked or damaged drainage channels.

  • Cleaning blockage of weep holes and outlet drainpipes.

  • Repair of missing or deteriorated pointing in masonry walls (drain sump).

Slope Monitoring

Unmanned Aerial Vehicle (UAV)

  • An unmanned aerial vehicle, commonly known as a drone, is a flying device which can be remotely operated by a remote controller. The collection of visual inspection to detect potential rock falls & landslide in difficult area to access.

DRAINAGE-CLEANING-GRASS-CUTTING
IMG_9601-scaled-1040x720